[Brahms-l] Shift report 20040312 16:00-24:00

From: Apache <apache@bnl.gov>
Date: Fri Mar 12 2004 - 00:26:49 EST
------------------------------------------------------------
Date: Fri Mar 12 00:26:48 2004, Shift: 16:00-24:00
Supervisor: CH, with: 
Log book#15 pages 84 - 85

Shift Summary:
------------------------------------------------------------
Got some data for 1/4 A FS @ 10 deg. and 1/1 A MRS @ 90 deg. 

Made a new button on BRAHVO that checks all channels and detectors, 
and prints a summary, ready to be attached to the shift check list.

1:
	3 1/2 hours development, 1 hour dead time between spills
	Otherwise good.

2:
	10909		Bad TPC ped run 
	10911		Short run. 
	10912		Data
	10913		Bad 
	10916		Data until dump

	total of 214664 trigger 3 events, and  305619 trigger 6 events. 
	
3: The RunServer of the DAQ keeps dying - pretty annoying.

------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Fri Mar 12 00:27:12 2004

This archive was generated by hypermail 2.1.8 : Fri Mar 12 2004 - 00:27:33 EST