------------------------------------------------------------ Date: Thu Mar 11 15:52:06 2004, Shift: 08:00-16:00 Supervisor: BB, with: Log book#15 pages 83 - 83 Shift Summary: ------------------------------------------------------------ 1. A beam quench occurred 1 hour and 20 minutes into the shift. No beam for rest of shift. 2. FS at 8 degrees full field. MRS at 90 degrees half field. Run 10904 (begun by previous shifters) Tr2 83k Tr 3 91k Run 10906 Tr 2 32k Tr3 49k There was ample time for overdue pedestal and non TPC pedestal runs. 3. After run 10906 Dana moved the FS to 10 degrees. Magnet water circulation was checked by MC. This required that the magnets be placed on standby. The FS magnets are now back on at 1/4 field and D5 is at 1/2 field. A problem with the RunServer was cured with a remedy given in the FAQ,or maybe it cured itself of a temporary hiccup. ------------------------------------------------------------ _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Thu Mar 11 15:52:44 2004
This archive was generated by hypermail 2.1.8 : Thu Mar 11 2004 - 15:53:09 EST