[Brahms-l] Shift report 20040226 16:00-24:00

From: Apache <apache@bnl.gov>
Date: Thu Feb 26 2004 - 00:00:23 EST
------------------------------------------------------------
Date: Thu Feb 26 00:00:23 2004, Shift: 16:00-24:00
Supervisor: BSN, with: PJ
Log book#15 pages 67 - 67

Shift Summary:
------------------------------------------------------------
1. Beam started 19:30, same store the rest of the shift

2. 
All FS 8deg. 1/2A MRS 40deg. full A
 
       tr 2  tr 3
10596  91    170k events
10597  52    137      
10598  39    145  
10599  24     91        

3. The detector had no problems.
------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Thu Feb 26 00:01:10 2004

This archive was generated by hypermail 2.1.8 : Thu Feb 26 2004 - 00:01:20 EST