[Brahms-l] Shift report 20040225 16:00-24:00

From: Apache <apache@bnl.gov>
Date: Wed Feb 25 2004 - 23:51:23 EST
------------------------------------------------------------
Date: Wed Feb 25 23:51:23 2004, Shift: 16:00-24:00
Supervisor: BSN, with: PJ
Log book#15 pages 67 - 67

Shift Summary:
------------------------------------------------------------
1. Beam started 19:30, same store the rest of the shift

2. 
All FS 8deg. 1/2A MRS 40deg. full A
 
       tr 2  tr 3
10596  91    170k events
10597  52    137      
10598  39    145  
10599  24     91        

3. The detector had no problems.
------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Wed Feb 25 23:52:07 2004

This archive was generated by hypermail 2.1.8 : Wed Feb 25 2004 - 23:52:27 EST