------------------------------------------------------------ Date: Fri Feb 13 15:57:28 2004, Shift: 08:00-16:00 Supervisor: EBJ, with: Log book#15 pages 55 - 55 Shift Summary: ------------------------------------------------------------ 1. The machine has been performing very well. We had useful beam most of the shift. 2. I collected close to 400k trig 2 events at full field. The D2 magnet seems to be operating fine. It has not tripped since I ramped it to full field around 9:30am. Ramiro came in and looked at the hall probe for the D2 magnet at 1/4 field. The current fluctuations in the current at 1/4 field do not show up in the hall probe. 3. No new detector problems. ------------------------------------------------------------ _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Fri Feb 13 15:57:43 2004
This archive was generated by hypermail 2.1.8 : Fri Feb 13 2004 - 15:58:08 EST