------------------------------------------------------------ Date: Fri Jan 2 23:59:50 2004, Shift: 16:00-24:00 Supervisor: sjs, with: Log book#15 pages 22 - 22 Shift Summary: ------------------------------------------------------------ 1. No beam until 21:15. Continuous store since then. 2. Pedestal (9326,9328-partial), TPC Pedestal(9327). Initial pedestal run 9326 found to take over hour. I realized afterwards that I by following our current instructions I was missing the ZDCs. I subsequently started a second run (9328) with FB1 selected, but stopped that short when we started to get beam. Data runs (trig 1): 9329(343K), 9331(77K), started 9332 3. No new detector problems found. ------------------------------------------------------------ _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Sat Jan 3 00:00:16 2004
This archive was generated by hypermail 2.1.8 : Sat Jan 03 2004 - 00:00:34 EST