-------- Original Message -------- Subject: Shift report 20031221 00:00-08:00 From: Apache <apache@pii3.brahms.bnl.gov> Date: Sun, December 21, 2003 6:33 am To: brahms-l@lists.bnl.gov, videbaek@bnl.gov ------------------------------------------------------------ Date: Sun Dec 21 06:33:36 2003, Shift: 00:00-08:00 Supervisor: hiro, with: catalin and oana Log book#15 pages 12 - 12 Shift Summary: ------------------------------------------------------------ 1. beam from 1am. (1 store) 2. run 9217 should be used to calibrate bb and zdc if TPM1 is working. (It looks like it is working but its drift voltage is at 4450V instead of 4900V) T3 does not hold voltage despite the several attempts. TPM2 is not on since it has pulser setting. c1/c4/h1/h2 high voltage does not communicate. Attenuation setting in PTQ for silicon has been adjusted. 3. E-Log spell checker function is finally working. (I need to put spell checker in shift report page too.) shift report should now be sent to our mailing list. (let's see if this shift report shows up in our list.) ------------------------------------------------------------ -- Flemming Videbaek Brookhaven National Laboratory Physics Department tlf 631-344-4106 fax 631-344-1334 e-mail: videbaek@bnl.gov _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Sun Dec 21 16:32:06 2003
This archive was generated by hypermail 2.1.8 : Sun Dec 21 2003 - 16:32:44 EST