From: Apache (apache@pii3.brahms.bnl.gov)
Date: Thu May 22 2003 - 23:59:33 EDT
------------------------------------------------------------ Date: Thu May 22 23:59:32 2003, Shift: 16:00-24:00 Supervisor: BB, with: Log book#14 pages 115 - 115 Shift Summary: ------------------------------------------------------------ Shift Summary: 1. Two attempts at ramping both failed. No beam this shift. 2. Pedestal, non-TPC pedestal and DVM runs only. 3. D2 was steady during the entire shift. The temperature of D1 rose by 20 C degrees from 9:30-11:30 pm. ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Fri May 23 2003 - 00:04:16 EDT