Shift report 20030522 16:00-24:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Thu May 22 2003 - 23:59:33 EDT

  • Next message: Apache: "Shift report 20030523 00:00-08:00"
    ------------------------------------------------------------
    Date: Thu May 22 23:59:32 2003, Shift: 16:00-24:00
    Supervisor: BB, with: 
    Log book#14 pages 115 - 115
    
    Shift Summary:
    ------------------------------------------------------------
      Shift Summary: 
    1. Two attempts at ramping both failed. No beam this shift.
    
    
     2. Pedestal, non-TPC pedestal and DVM runs only.
    
     3. D2 was steady during the entire shift. The temperature of D1 rose by 20 C degrees from 9:30-11:30 pm.
    ------------------------------------------------------------
    


    This archive was generated by hypermail 2.1.5 : Fri May 23 2003 - 00:04:16 EDT