------------------------------------------------------------ Date: Thu May 22 08:03:15 2003, Shift: 00:00-08:00 Supervisor: hiro, with: Log book#14 pages 115 - 115 Shift Summary: ------------------------------------------------------------ 1. beam for 2hr but D1 and D2 tripped. Air conditioning in magnet power supply room is broken. I was told not to turn on D1 and D2 until the AC is fixed. Right before my submission, the AC was fixed. 2. 9009 3. Silicon detector has been turned off until the end of the current pp run. ------------------------------------------------------------