From: Apache (apache@pii3.brahms.bnl.gov)
Date: Wed May 21 2003 - 16:15:21 EDT
------------------------------------------------------------ Date: Wed May 21 16:15:20 2003, Shift: 08:00-16:00 Supervisor: kh, with: Log book#14 pages 115 - 115 Shift Summary: ------------------------------------------------------------ The pp2pp run was in progress today. We turned on D5 and the tracking detectors. Took several min bias runs. FFS is at 8 deg (moved out of the way for pp2pp run); BFS is at 4 deg, so we took 0 field run for FFS. D5 is set at 350B All in all, it is fairly laid back. ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Wed May 21 2003 - 16:19:18 EDT