From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sun May 11 2003 - 08:01:52 EDT
------------------------------------------------------------ Date: Sun May 11 08:01:52 2003, Shift: 00:00-08:00 Supervisor: sjs, with: Log book#14 pages 106 - 106 Shift Summary: ------------------------------------------------------------ Beam for almost 6.5 hours during shift, with only one beam dump (voted by STAR and PHENIX). (PHENIX just voted for a dump. 7:53 am). Data runs (trig 2): 8896(376), 8897(90), 8900(312), 8901(158,still running). One problem noted during shift: We have lost the rate histograms. These seem to have disappeared sometime last evening. Could this be related to the polarization scaler tests? ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Sun May 11 2003 - 08:05:39 EDT