From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sat May 10 2003 - 22:50:29 EDT
------------------------------------------------------------
Date: Sat May 10 22:50:28 2003, Shift: 16:00-24:00
Supervisor: jjg, with:
Log book#14 pages 104 - 105
Shift Summary:
------------------------------------------------------------
1. Collisions active after 16.10
Beam dumped at 17.10 :yellow polarization down to 14%
Collisions back at 18.48 (1.5 hrs beam recovery time)
Collimation and steering completed at 19.25 (40 min)
Good stable store from 19.00.
Lum. Y/B = 30/35.
Yellow pol. drops from 29% at start to 27% at 21.00,
20% at 21.30.
Beam dumped at 22.45 after 'unbiased' vote.
2. Running MRS 40 deg, 2000A, FS 12 deg. 1/2A.
Runs: 8891 Tr2= 80 Tr6= 4267 evts= 53k
8892 38 2013 26k
8893 143 7305 90k
8894 487 25336 315k
8895 7 543 6k
3. No obvious ones...to me at least
4. I don't expect to see more beam before the next shift - so you get an early shift report. Gas dets. are in park mode.
------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Sat May 10 2003 - 22:56:12 EDT