From: Apache (apache@pii3.brahms.bnl.gov)
Date: Fri May 02 2003 - 15:35:11 EDT
------------------------------------------------------------
Date: Fri May 2 15:35:10 2003, Shift: 08:00-16:00
Supervisor: EUn-Joo Kim, with:
Log book#14 pages 90 - 90
Shift Summary:
------------------------------------------------------------
1. Beam for most shift time.
RF setup work continued.
Spin pattern is not complete and so on.
2. FS 1/8A at 8-degree
-- Run8764, 8765 : 39k trigger2
FS D3,D4 zero-field at 8-deg
-- Run8766 : 11k trigger2
FS 1/8B at 8-degree
-- Run8768, 8769 : 13k trigger2
*** Run8767 : special run for FV
The spec triggers are the hodoscopes + RC .
The INL was excluded.
The INL trigger ,i.e.,5 is L.R (w/o) RC.
MRS 6B at 40-degree
-- Run8764, 8765, 8766: 245K trigger3
MRS 6A at 40-degree
-- Run8768, 8769 : 57k trigger3
3. Mainframe for TFW2 : still not working
------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Fri May 02 2003 - 15:35:51 EDT