Fw: 5/1 8:30 meeting on RHIC commissioning

From: Flemming Videbaek (videbaek@sgs1.hirg.bnl.gov)
Date: Fri May 02 2003 - 09:17:18 EDT

  • Next message: Apache: "Shift report 20030502 08:00-16:00"
    FYI yesterday's minutes from the 8.30 meeting. As we know by now the
    nights commisioning and beam storage did not go that well.
    
    Flemming
    
    ------------------------------------------------------
    Flemming Videbaek
    Physics Department
    Brookhaven National Laboratory
    
    tlf: 631-344-4106
    fax 631-344-1334
    e-mail: videbaek@bnl.gov
    
    ----- Original Message -----
    From: "haixin huang" <huanghai@bnl.gov>
    To: "Huang, Haixin" <huanghai@bnl.gov>; "Beavis, Dana" <beavis@bnl.gov>; "Christie, William" <christie@bnl.gov>;
    <matthias@bnl.gov>; "Bueltmann, Stephen" <bueltmann@bnl.gov>; <hofman@uic.edu>; "Roser, Thomas" <roser@bnl.gov>; "Pile,
    Philip H" <pile@bnl.gov>; "Peggs, Stephen G" <peggs@bnl.gov>; "Rusek, Adam" <rusek@bnl.gov>; "McNerney, Andrew J"
    <mcnerney@bnl.gov>; "Ganetis, George" <ganetis@bnl.gov>; "Bruno, Donald" <bruno@bnl.gov>; "Ingrassia, Peter F"
    <ingrassia@bnl.gov>; "Sampson, Paul" <sampson@bnl.gov>; "Morris, John" <jtm@bnl.gov>; "D'Ottavio, Ted" <dottavio@bnl.gov>;
    "Oerter, Brian R" <oerter@bnl.gov>; "Brennan, Joseph" <brennan@bnl.gov>; <blaskiew@bnl.gov>; "Fischer, Wolfram"
    <wfischer@bnl.gov>; "Cameron, Peter" <cameron@bnl.gov>; "Connolly, Roger" <connolly@bnl.gov>; "Drees, Kirsten"
    <drees@bnl.gov>; "Pilat, Fulvia C" <pilat@bnl.gov>; "Bai, Mei" <mbai@bnl.gov>; "Ptitsyn, Vadim" <vadimp@bnl.gov>;
    "''Christoph Montag ' '" <montag@bnl.gov>; "Satogata, Todd J" <satogata@bnl.gov>; <dejan@bnl.gov>; "Beebe-Wang, Joanne J"
    <bbwang@bnl.gov>; "Calaga, Rama" <rcalaga@bnl.gov>; "Cardona, Javier" <jcardona@bnl.gov>; "Hahn, Harald" <hahnh@bnl.gov>;
    "Ahrens, Leif A" <ahrens@bnl.gov>; <kbrown@bnl.gov>; "Fliller, Raymond" <rfliller@bnl.gov>; "Iriso-Ariz, Ubaldo"
    <ubaldo@bnl.gov>; "Tepikian, Steven" <tepikian@bnl.gov>; "Van Zeijts, Johannes" <johannes@bnl.gov>; "Benante, John T"
    <benante@bnl.gov>; <zaharatos@bnl.gov>; "Dellapenna Jr, Alfred" <dellapenna@bnl.gov>; "Lowenstein, Derek I"
    <lowenstein@bnl.gov>; "Bland, Leslie C" <bland@bnl.gov>; "Deshpande, Abhay" <abhay@bnl.gov>; "Jinnouchi, Osamu"
    <josamu@bnl.gov>; <bravar@bnl.gov>; <Dmitry.Svirida@itep.ru>; <wood@cooper.physics.ucla.edu>; <igo@physics.ucla.edu>;
    "Guryn, Wlodzimierz" <guryn@bnl.gov>; <hms@hep.anl.gov>; <dgu@hep.anl.gov>; <videbaek@bnl.gov>
    Sent: Thursday, May 01, 2003 5:12 PM
    Subject: 5/1 8:30 meeting on RHIC commissioning
    
    
    | Minutes of 4/30 8:30 meeting
    |
    |     STATUS:
    |
    | 1.  PHENIX measured Yellow polarization in longitudinal direction yesterday.
    |
    | 2. The anti-cog problem continued overnight and prevent delivering collision to
    | experimenters.
    |
    |
    |   PLAN:
    | 1. recover RHIC from maintenance.
    |
    | 2. Solve the anti cog problem to maintain all beam injected. A new anti-cog "button"
    | has been created and will be tested at injection.  The separation bump at 6 o'clock
    | area has been changed to reduce the beam loss there (the chipmunk has pulled permit
    | many times).
    |
    | 3. Provide 55X55 collisions with 5*10^10/bunch first. Gradually increase bunch
    | intensity.
    |
    |
    | Haixin
    |
    |
    |
    |
    |
    |
    


    This archive was generated by hypermail 2.1.5 : Fri May 02 2003 - 09:13:15 EDT