From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sat Mar 15 2003 - 23:54:55 EST
------------------------------------------------------------
Date: Sat Mar 15 23:54:55 2003, Shift: 16:00-24:00
Supervisor: rw, with:
Log book#14 pages 64 - 64
Shift Summary:
------------------------------------------------------------
1. 16:00 Preparing for ramping.
16:20 Beam is cogged. 4k on ZDC 8k on TOFW
18:00-20:00 Hiro used beam for global check run.
20:00 PHINIX voted for dump. We voted,too.
20:40 Beam dumped.
21:20 Beam Cogged 7k on ZDC 8k on TOFW.
21:30 Start data taking.
2. run tr2 scale down tr3 scale down comments
8401 2.2k 2 23k 1
8402 11k 4 55k 2 7k ZDC 8K TOFW
8403 9k 3 91k 1
8404 Hiro's global check run
8405 "
8406 1.5k 1 15k 1
8407-8409 Pedestal and dvm runs.
8410 1.8k 5 9k 2
8411 10k 4 52k 2
8412 10k 2 101k 1
8413 1 1 running
3. T3 1&3 off.
------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Sun Mar 16 2003 - 00:00:24 EST