Shift report 20030315 16:00-24:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sat Mar 15 2003 - 23:54:55 EST

  • Next message: Apache: "Shift report 20030316 08:00-16:00"
    ------------------------------------------------------------
    Date: Sat Mar 15 23:54:55 2003, Shift: 16:00-24:00
    Supervisor: rw, with: 
    Log book#14 pages 64 - 64
    
    Shift Summary:
    ------------------------------------------------------------
    1. 16:00 Preparing for ramping.
       16:20 Beam is cogged.   4k on ZDC   8k on TOFW
       18:00-20:00 Hiro used beam for global check run.
       20:00 PHINIX voted for dump. We voted,too.
       20:40 Beam dumped.
       21:20 Beam Cogged    7k on ZDC 8k on TOFW.
       21:30 Start data taking.
    
    2.  run     tr2  scale down   tr3  scale down     comments
        8401    2.2k     2        23k     1
        8402    11k      4        55k     2     7k ZDC  8K TOFW
        8403    9k       3        91k     1           
        8404                          Hiro's global check run 
        8405                                    "  
        8406    1.5k     1        15k     1
        8407-8409  Pedestal and dvm runs.
        8410    1.8k     5        9k      2
        8411    10k      4       52k      2
        8412    10k      2      101k      1
        8413             1                1   running
    
    3. T3 1&3 off.
    ------------------------------------------------------------
    


    This archive was generated by hypermail 2.1.5 : Sun Mar 16 2003 - 00:00:24 EST