From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sat Mar 15 2003 - 16:00:13 EST
------------------------------------------------------------ Date: Sat Mar 15 16:00:13 2003, Shift: 08:00-16:00 Supervisor: ZY, with: RL Log book#14 pages 62 - 64 Shift Summary: ------------------------------------------------------------ 1. The first store from 9:10 to 12:30. The second store starts at 14:15, but due to timing problem between the yellow and blue beam, it was dumped at 14:50. 2. Data runs For MRS at 90deg 1050B, FS at 4deg 1/2B RUN 8390: trg 2 68k, trg 3 36k For MRS at 90deg 1050B, FS at 4deg 1/1B RUN 8391: tr2 12k, tr3 57k RUN 8392: tr2 2.5k, tr3 22k RUN 8399: tr2 8k, tr3 26k 3. The modules 1 and 3 of T3 are off. ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Sat Mar 15 2003 - 16:01:02 EST