From: Apache (apache@pii3.brahms.bnl.gov)
Date: Fri Mar 14 2003 - 15:54:39 EST
------------------------------------------------------------ Date: Fri Mar 14 15:54:38 2003, Shift: 08:00-16:00 Supervisor: RL, with: Log book#14 pages 61 - 61 Shift Summary: ------------------------------------------------------------ 1 Beam from 10:50 to 11:40, and then again from 13:30 to 14:40. 2 Pedestal(8369), TRC pedestal(8370) and DVM(8371) MRS@90(B1050), FS@4(1/1A) Data run 8372, tr2 4k and tr3 33k Zero field run 8373, MRS@90, FR@4, d1=1/4A, rest=0 Zero field run 8374, MRS@90, FR@4, d1=d2=1/4A, rest=0 Check-out run 8375 MRS@90(B1050), FR@12(1/4A) 3 No detector problems ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Fri Mar 14 2003 - 15:56:02 EST