Shift report 20030314 08:00-16:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Fri Mar 14 2003 - 15:54:39 EST

  • Next message: Flemming Videbaek: "RHIC run schedule"
    ------------------------------------------------------------
    Date: Fri Mar 14 15:54:38 2003, Shift: 08:00-16:00
    Supervisor: RL, with: 
    Log book#14 pages 61 - 61
    
    Shift Summary:
    ------------------------------------------------------------
    1 Beam from 10:50 to 11:40, and then again from 13:30 to 14:40.
    2 Pedestal(8369), TRC pedestal(8370) and DVM(8371)
    MRS@90(B1050), FS@4(1/1A)
    Data run 8372, tr2 4k and tr3 33k
    Zero field run 8373, MRS@90, FR@4, d1=1/4A, rest=0
    Zero field run 8374, MRS@90, FR@4, d1=d2=1/4A, rest=0
    Check-out run 8375 MRS@90(B1050), FR@12(1/4A)
    3 No detector problems
    ------------------------------------------------------------
    


    This archive was generated by hypermail 2.1.5 : Fri Mar 14 2003 - 15:56:02 EST