Shift report 20030311 00:00-08:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Tue Mar 11 2003 - 07:37:37 EST

  • Next message: Flemming Videbaek: "RHIC access and Beam Experiments"
    ------------------------------------------------------------
    Date: Tue Mar 11 07:37:37 2003, Shift: 00:00-08:00
    Supervisor: rw, with: 
    Log book#14 pages 57 - 57
    
    Shift Summary:
    ------------------------------------------------------------
    1. Beam was cogged at 00:05. ZDC ~15K TOFW ~20K.
       0:45 Beam is gone. Yellow kicker misfire.
       2:05 Beam is cogged.  7.5K on ZDC 10K on TOFW.
       4:10 Beam away. RHIC Quench link interlock.
       5:30 RHIC Injection Magnet Power Suply Problm. Expert is called.
       7:30 Expert is in. 
    
    2.  Run     Tr2       Tr3
        8308    7.3K      37K
        8311    3k         0     no T3 data (T3-map error in DAQ)
        8317    6k         0     no T3 data (T3-map error in DAQ)
        8319                     Pedestal run
        8320                     TPC Pedestal run
        8321                     DVM run
    
    
    3.  T3-A3 HV off. DAQ T3-map alarm stayed ON. No T3 data.
    
    
    
    ------------------------------------------------------------
    


    This archive was generated by hypermail 2.1.5 : Tue Mar 11 2003 - 07:42:51 EST