From: Apache (apache@pii3.brahms.bnl.gov)
Date: Tue Mar 11 2003 - 00:00:08 EST
------------------------------------------------------------ Date: Tue Mar 11 00:00:08 2003, Shift: 16:00-24:00 Supervisor: FR, with: SL Log book#14 pages 55 - 57 Shift Summary: ------------------------------------------------------------ 1) After a couple of unsuccessful ramps, MCR could store the beam from 20:20 to 21:10. They dumped for a RHIC cryo ring access. Next store started around 23:40 with initial rates: ZDC~11k and TOFW~18k. 2) Runs 8304-8306 are calibration runs. Run 8307 is a data run for MRS @90deg - 1050A and FS @4deg - 1/1A. It has ~3k trigger 2 events. Run 8308 started at the end of the shift (same setting as Run 8307). 3) The inelastic trigger was retimed by Flemming (see Log Book 14, pg 55-56 for details) No detector problems. ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Tue Mar 11 2003 - 00:00:56 EST