Shift report 20030310 00:00-08:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Mon Mar 10 2003 - 07:49:07 EST

  • Next message: Hironori Ito: "brahms E-log"
    ------------------------------------------------------------
    Date: Mon Mar 10 07:49:07 2003, Shift: 00:00-08:00
    Supervisor: rw, with: MM
    Log book#14 pages 53 - 53
    
    Shift Summary:
    ------------------------------------------------------------
    1. Beam was cogged at 1:30. Tr6 rate was around 250. Low back ground 
       (TOFW/ZDC ~ 1.1)
       7:30 Voted for dump. 
    
    2.  Run     Tr2       Tr3
        8291                     Pedeatal run
        8292                     TPC Pedestal run
        8293                     DVM run
        8294     11k      147k   MRS @90deg. (1050A);FS @4deg. (1/1A) 
        8295     10k      128k   Tr6 scaled by 3   
        8296     10K      128k   Tr6 scaled by 2 
        8297     10K      124K
        8298    ~10K     ~120K   Tr6 scaled by 1, running  
    
    3.  T3-A3 HV off. No other problems.
    ------------------------------------------------------------
    


    This archive was generated by hypermail 2.1.5 : Mon Mar 10 2003 - 07:50:20 EST