Shift report 20030307 16:00-24:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Fri Mar 07 2003 - 23:54:52 EST

  • Next message: Apache: "Shift report 20030308 00:00-08:00"
    ------------------------------------------------------------
    Date: Fri Mar  7 23:54:52 2003, Shift: 16:00-24:00
    Supervisor: rw, with: sl
    Log book#14 pages 51 - 51
    
    Shift Summary:
    ------------------------------------------------------------
    1.Beam was cogged at 7:45pm. d 42/Au 20. about 200-300c/s at tr6
    
    2. run      tr2       tr 3      comment
       8250     2.7k       47k      DVM pulser scaled 100
       8251     10k       151k      DVM scaled by 30\
       8252     4k         64k      T3 A3 HV off during the run
       8253     10k       141k      
       8254     running
    
    3. T3 A3-yv HV problem. No other detector problem.
    ------------------------------------------------------------
    


    This archive was generated by hypermail 2.1.5 : Fri Mar 07 2003 - 23:58:32 EST