From: Apache (apache@pii3.brahms.bnl.gov)
Date: Fri Mar 07 2003 - 15:56:50 EST
------------------------------------------------------------ Date: Fri Mar 7 15:56:50 2003, Shift: 08:00-16:00 Supervisor: ykl, with: Log book#14 pages 15 - 16 Shift Summary: ------------------------------------------------------------ 1.The beams is off since 9.30AM. They are beginning to inject now. 2.MRS @90 deg, A1050, and FS @4 deg 2/3A. run 8246 had 57k trig3 and 11.7K trig 2. run 8247(DVM), run 8248(pedestals), run 8249(TPC pedestals). 3.D5 tripped. Fan for the shunt was replaced. T3-C3-yv tripped and is now off. Plan: MRS @ 90 deg, A1050, for lots of statistics; FS @ 4 deg, 1/1A for 100K trig 2. ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Fri Mar 07 2003 - 16:01:25 EST