    Dear Collaborator
    
    As you may have seen there will be an access day tomorrow Wednesday.
    The main activities will be
    1)the initial installation of the C4 Cherenkov detector. Steve, Ramiro an
    Hiro are currently mounting the mirrors, and by tomorrow should be reay to
    move the parts/sections to thye IR assembling the detector, and start the
    filling with C4F10. If all goes well we may have time to move the detector
    the the MRS platform before the 5 pm shutoff time; It may though require a
    couple of more short accesses before PMTs are mounted, connected and reay
    to take beam.
    
    2) Switch the non-working L1458A with a repaired version. The concern here
    is really that it is not understood whey the thermal overload and loss of
    24V lines get about. One possible action might be to remove the critical
    TPC field voltages and anodes from the L4158A and move to seperate supplies
    even though this may make operation more cumbersome.
    
    3) Investigating the DC problems in T3 module 1 and T5 module 2.
    
    regards
         Flemming
    
    
    
    
    -- 
    Flemming Videbaek
    Brookhavne National Laboratory
    Physics Department
    tlf 631-344-4106
    fax 631-344-1334
    e-mail: videbaek@bnl.gov
    


    This archive was generated by hypermail 2.1.5 : Tue Feb 25 2003 - 18:50:57 EST