Shift report 20030205 08:00-16:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Wed Feb 05 2003 - 15:45:02 EST

  • Next message: Apache: "Shift report 20030206 16:00-24:00"
    ------------------------------------------------------------
    Date: Wed Feb  5 15:45:02 2003, Shift: 08:00-16:00
    Supervisor: IA, with: AlJ
    Log book#13 pages 149 - 149
    
    Shift Summary:
    ------------------------------------------------------------
    1. Beam studies during whole shift
    2. 4 pedestal runs - 7799 TPC pedestal run, 7800 Non TPC pedestal run, 7801 DVM pedestal run (scaledowns 1, 1), 7802 DVM pedestal run (scaledowns 10, 1).
    3. Flemming observed some anomalities in the response of a few detectors. Therefore, a new DVM pedestal to test ZDC/INL  fastbus module.  
    ------------------------------------------------------------
    


    This archive was generated by hypermail 2.1.5 : Wed Feb 05 2003 - 15:45:58 EST