From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sun Jan 26 2003 - 23:51:34 EST
------------------------------------------------------------ Date: Sun Jan 26 23:51:34 2003, Shift: 16:00-24:00 Supervisor: RP, with: Log book#13 pages 131 - 131 Shift Summary: ------------------------------------------------------------ 1. beam on from 16:28 till 22:21 2. run7646- FS, 4deg, 1/8B, done; run7647 -MRS, 90 deg, 2B, done; run7648 - FS, 4deg, 1/4B, done; run7649 -FS, 4 deg, 1/3B (D1), D2=D3=D4=0, done; run7650 -FS, 4deg, 1/3B (D1,D2), D3=D4=0, done; run7651 -FS, 3deg, 1/4B, done; run7652 -FS, 3deg, 1/2B, done; run7653 pedestal run run7654 TPC pedestal run run7655 DVM run 3. no detector problems ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Sun Jan 26 2003 - 23:52:04 EST