Dear Collaborator, As discussed at the collaboration meeting in May, and also in an e-mail a while before QM the Beam Use proposal for run-3 (FY2003) has to be submitted by Monday afternoon at 4.30 pm Due to QM02 and my subsequent vacation the first draft has not been available before. I have had very little input from, the previous mailings that outlined the intended beam Use proposal, so the draft attached to this e-mail should follows that outline. Some details i.e. required Luminosities still have to be worked out , and will be done so over the weekend. It is my intention to prepare a next draft by Sunday, but all comments received before Monday noon EDT will be duely considered. I think the draft has about the right overall length; I will in particular be glad to receive suggested rewording of text, paragraphs, input to the physics justifcations. The real battelewill be during the PAC meeting on August 26 since the requests from the experiments are not very likely to overlap very well. We have in CDR as well as in previous RBUPs always mention the desire to measure clusters (d,t and heavier) but have never given a real estimate for what is needed. I think if we are to keep this we should evaluate if this can be done within the ~7 weeks of Au-Au running with at most 7*35 microb(-1) best regards Flemming The document is attached as both a word doc as well as an pdf file. ------------------------------------------------------ Flemming Videbaek Physics Department Brookhaven National Laboratory tlf: 631-344-4106 fax 631-344-1334 e-mail: videbaek@bnl.gov
This archive was generated by hypermail 2b30 : Fri Aug 09 2002 - 16:51:52 EDT