------------------------------------------------------------
Date: Sun Dec 23 08:02:56 2001, Shift: 00:00-08:00
Supervisor: james norris, with: 
Log book#11 pages 79 - 80
Shift Summary:
------------------------------------------------------------
 23:20 - Snake quench recovry complete.  Working on injection
           and ramp problems.
   01:10 - Work on injection and ramp problems continues...
   02:50 - Work on injection and ramp problems continues...
   03:23 - Preparing to ramp 55 bunches
   03:50 - Beam stored at top energy.  Measuring polarization.
   05:25 - MCR called to announce polarization measureent.
   06:15 - I called to ask if polarization measurement was 
	   complete, and was told "it was finished a few minutes 
	   ago".
   06:47 - MCR called to announce beam dump.
   07:10 - Preparing for next ramp
   08:00 - Quench Link Interlock
		  Triggers 1,     3,    6,    7,    8
2. PP Data Run 6121   112.9K,  1.3K, 3.2K,   2K, 4.6K
   PP Data Run 6122    15.3K,   .2K,  .6K,  .8K, 1.9K
   Pedestal Run 6123
   DVM Run 6124
3. The Argon for T1 & T2 is running at 92.5 which is much higher 
   than I've ever seen it before.
   Received the following error message:
     pii4:operator> multStatus 6123
     multStatus: error in loading shared libraries: 
       /opus/home/operator/brahms_app/sjs_app/lib/libmultReplay.so: 
     undefined symbol: 
       SetStatus__8BrModuleQ28BrModule15EBrModuleStatus
   Virtual Desktop toolbar was recovered, though it appears along 
   the top of the monitor, by running 
   Programs>Applets>Utility>Desk Guide.
------------------------------------------------------------
This archive was generated by hypermail 2b30 : Sun Dec 23 2001 - 08:03:19 EST