------------------------------------------------------------
Date: Fri Dec 21 08:09:23 2001, Shift: 00:00-08:00
Supervisor: James Norris, with: Flemming Videbaek
Log book#11 pages 66 - 66
Shift Summary:
------------------------------------------------------------
1. 20:35 - Yellow Queech Link Interlock
   21:45 - Yellow Quench Link Interlock
   22:40 - Preparing to Accelerating 55 bunches
   22:50 - Ramp tuning.  Ramping to injection.
   00:13 - Preparing 55 bunch store for physics
   00:24 - Will ramp for physics store after 
           polarization measurements at injection
   00:47 - Beam has been cogged for physics
		      Triggers 1, 2, 7, 8
2. PP Data Run 6083 - 759.8K, 308.1K, 6.6K, 10.6K
   PP Data Run 6084 - 233.0K, 144.8K, 3.5K,  5.5K
   PP Data Run 6085 - 177.4K, 120.4K, 3.2K,  5.1K
   MRS Angle: 90, FS Angle: 8
   Checking timing of trigger counters with beam.
   - The 6 slat behind tofw behaves ok. reasonable
     pedestal, and timing response.
   - The front overlap is made at ~ 17 nsec.
     coinc Left-Right w/o beam ~ 230/sec.
   - Made first attempt for MRS trigger.
     time diff between MRS-Front Left-Right to
     Back 1-6 ~ 114 nsec. Made overlap -
     Fed into trigger 3 (as latch for Min bias run)
     when ever a store succeeds.
3. No Detector Problems.
   Data Run Length Criteria needed - have been 
     stopping at ~5K Trigger 8 because this is
     ~= 100K Trigger 6 from AuAu Data Runs
   Store Dump criteria needed.
------------------------------------------------------------
This archive was generated by hypermail 2b30 : Fri Dec 21 2001 - 08:09:58 EST