------------------------------------------------------------
Date: Fri Nov 16 16:06:17 2001, Shift: 08:00-16:00
Supervisor: TML, with:
Log book#10 pages 149 - 149
Shift Summary:
------------------------------------------------------------
1. 1 long store the at 13.15 beamstudies first at Phoenix, then 3M beta* at injection. No beam yet at end of shift.
2 run trig1 trig6
5833 328k 105k
5834 332k 104k
5535 232k 72k
5836 Pedestal
5837 DVM pedestal
5838 TPC pedestal
3. Nope.
------------------------------------------------------------
This archive was generated by hypermail 2b30 : Fri Nov 16 2001 - 16:06:59 EST