Shift report 20011102 16:00-24:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Fri Nov 02 2001 - 00:11:51 EST

  • Next message: Apache: "Shift report 20011102 00:00-08:00"

    ------------------------------------------------------------
    Date: Fri Nov  2 00:11:51 2001, Shift: 16:00-24:00
    Supervisor: CEJ, with: 
    Log book#10 pages 84 - 85
    
    Shift Summary:
    ------------------------------------------------------------
    1. Beam study (PHENIX beta*) untill 20.30. First ramp 
       failed. Ramped again at 23.15, problems with cogging?
       Beam "steered" at 24:00. BRAHMS ZDC<160. PHENIX~1000.
    
    2. Runs:
       Poor data run 5621 (while steering, T3 tripped).
       Pedestal runs 5622. Tpc pedestal run 5623.
    
    3. No problems (except DC trips)
    ------------------------------------------------------------
    