------------------------------------------------------------ Date: Fri Nov 2 00:11:51 2001, Shift: 16:00-24:00 Supervisor: CEJ, with: Log book#10 pages 84 - 85 Shift Summary: ------------------------------------------------------------ 1. Beam study (PHENIX beta*) untill 20.30. First ramp failed. Ramped again at 23.15, problems with cogging? Beam "steered" at 24:00. BRAHMS ZDC<160. PHENIX~1000. 2. Runs: Poor data run 5621 (while steering, T3 tripped). Pedestal runs 5622. Tpc pedestal run 5623. 3. No problems (except DC trips) ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Fri Nov 02 2001 - 00:12:23 EST