------------------------------------------------------------ Date: Thu Nov 1 15:55:14 2001, Shift: 08:00-16:00 Supervisor: BB, with: none Log book#10 pages 82 - 84 Shift Summary: ------------------------------------------------------------ 1.Shift started out with 2 good runs ZDC ~470 Hz 2. Run 5616 with 101k trigger6 Run 5617 with 17k trigger6 Although no changes to run page or parameters were made between runs, run 5616 was not written to HPSS while run 5617 was. Beam died just after run 5618 was started. No beam for the rest of the shift,"Studies for Phenix beta ramp". All magnet polarities were reversed and magnets left in standby mode. 3. No detector problems. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Thu Nov 01 2001 - 15:56:00 EST