------------------------------------------------------------
Date: Tue Oct 16 08:26:49 2001, Shift: 00:00-08:00
Supervisor: Y. K. Lee, with:
Log book#10 pages 15 - 16
Shift Summary:
------------------------------------------------------------
1. Ramping was difficult. There was only one store of
three and 1/2 hours and the beam was not satisfactorily
steered to BRAHMS. The ZDC rate was 220 /sec.
2. MRS @45 deg, 4B; FS @4/4 deg, 1/5B.
Run 5367 had 225K trigger-1.
Run 5368 had 91K trigger-1.
Pulser and source runs
Run 5365 is Detector pedestal run.
Run 5366 is TPC pedestal run.
Run 5369 is Drift Velocity Monitor run.
3. Detector problems:
ZDC still has the Right Module 1 Low missing.
BB has ADC Left Module 37 missing.
BB Small Right ADC 25 has small signal (1/5).
TOFW TOP 92 slat missing.
------------------------------------------------------------
This archive was generated by hypermail 2b30 : Tue Oct 16 2001 - 08:27:33 EDT