------------------------------------------------------------ Date: Sat Oct 13 23:57:07 2001, Shift: 16:00-24:00 Supervisor: CEJ, with: DO Log book#9 pages 148 - 149 Shift Summary: ------------------------------------------------------------ 1. Short store in the beginning of the run. Problems steering, low ZDC rates at BRAHMS and STAR. Dumped beam at 17.30. Cryo problem, problem in AGS to RHIC transfer line, changing of a foil in the tandem, quench link interlock. Several attempts to store and ramp beam...no luck this evening. Last night the intensity looked like the alpes - this evening it was more like sjaelland (very flat!). 2. Two short data runs: 5313 (T3 anode3 at 900V) & 5314 Pedestal run 5315, TPC pedestal run 5316 3. YKL tried to fix tile 33, we need data to see the result. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Sat Oct 13 2001 - 23:57:51 EDT