------------------------------------------------------------ Date: Thu Sep 27 08:13:37 2001, Shift: 00:00-08:00 Supervisor: J.I.Jordre, with: NN Log book#9 pages 54 - 55 Shift Summary: ------------------------------------------------------------ 1. Beam from 03:45 to 06:22. One "Cryogenic PLC failure which took about 1.5 hours to fix. Now at 7:45 the beam (read: a failed store) was dumped for cryo ring entry. 2. Run 4980 Data run with 173.8k trigger 1 events Run 4981 TPC pedestal run Run 4982 DVM run Run 4983 Pedestal run without TPCs (FS @ 3 deg., A pol., 1/3 field, MRS @ 90 deg., B pol., I=700A) 3. TOFW Bottom Ch. 25 not good => Dana is attacking the problem. ------------------------------------------------------------