------------------------------------------------------------ Date: Sat Sep 22 09:03:47 2001, Shift: 00:00-08:00 Supervisor: hito, with: Log book#9 pages 24 - 25 Shift Summary: ------------------------------------------------------------ 1. beam until 0:20 At 0:20 QLI. At 1:34, power dip. 2. None 3. Because of the power dip, we completly lost the communication to all 4032. I(hiro) went into the IR in the control access to check the HV. It was still on. Until it is fixed, I suggests that nobody will recyle the 4032s (BBR, BBL, BBBig, Tile, gating grid, , tofwcal). T3 first module still needs fix. Magnet is in standy-fault mode, the magnet watch needs to fix it. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Sat Sep 22 2001 - 09:04:22 EDT