Shift report 20010922 16:00-24:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sat Sep 22 2001 - 00:57:35 EDT

  • Next message: Apache: "Shift report 20010922 00:00-08:00"

    ------------------------------------------------------------
    Date: Sat Sep 22 00:57:35 2001, Shift: 16:00-24:00
    Supervisor: JH Lee, with: 
    Log book#9 pages 22 - 24
    
    Shift Summary:
    ------------------------------------------------------------
     1. Beam:
        Cogged Beam for 21:15 - 00:20
        with initial rates ZDC=350/sec, and
        Events=150/sec (with triggers 1,4,7,8)
      
     2. Data:
        run 4844, 4855: 500K trigger1  MRS@90, FS@8
        with D5=0, and D3=0 
        d1,d2,d4: 1/5A setting
    
     3. A vertex trigger has been set up as trigger5 (FV)
        ntuple macro has been updated to monitor the trigger
        
        
        
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Sat Sep 22 2001 - 00:57:59 EDT