Shift report 20010921 00:00-08:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Fri Sep 21 2001 - 08:00:06 EDT

  • Next message: Jens Jorgen Gaardhoje: "Run plan"

    ------------------------------------------------------------
    Date: Fri Sep 21 08:00:06 2001, Shift: 00:00-08:00
    Supervisor: EJ, with: DS
    Log book#9 pages 19 - 20
    
    Shift Summary:
    ------------------------------------------------------------
    1. Beam for 5 hours (to 2:30 and 4:25-7:00). Beam shut
       down due to lightning.
    
    2. #4835 ( 80K trig 1 events.)
       #4836 ( 88K trig 1 events.)
       #4837 (246K trig 1 events.)
       #4838 ( 44K trig 1 events.)
              ----
              458K
    
    3. Same problems at with last run - no connection to main
       frame (TILES4 and TILES5). Connection to L1458B was 
       somehow lost. We turned it back on. 
    
    ------------------------------------------------------------
    