------------------------------------------------------------
Date: Wed Sep 19 15:50:41 2001, Shift: 08:00-16:00
Supervisor: EJ, with: DS
Log book#9 pages 8 - 11
Shift Summary:
------------------------------------------------------------
1. Beam until 11.40. Beam studies most of the day.
2. FS magnets at 1/5 pol A and D5 at 700 Amps. 
   Run 4809 (191K trig 1)
   Run 4810 ( 80K trig 1)
   Run 4811 ( 48K trig 1)
             ----
   Total     319K
             
   Run 4814 (Pulser run)   
3. Flemming looked into problem with BB right ADC #9. 
------------------------------------------------------------
This archive was generated by hypermail 2b30 : Wed Sep 19 2001 - 15:51:08 EDT