Shift report 20010919 00:00-08:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Wed Sep 19 2001 - 08:22:16 EDT

  • Next message: Apache: "Shift report 20010919 08:00-16:00"

    ------------------------------------------------------------
    Date: Wed Sep 19 08:22:16 2001, Shift: 00:00-08:00
    Supervisor: J.I.Jordre, with: none
    Log book#9 pages 7 - 8
    
    Shift Summary:
    ------------------------------------------------------------
    1. MCR unable to clear blue quench link interloch that occurred
       before midnight. Experts were called for and they fixed
       the faulty "quench protection assembly interface chassis".
       Beam since 05:40. 
       Dana went to MCR to ask them to steer the beam in BRAHMS IR,
       as our ZDC rates were about half the rates of STAR and PHENIX.
       MCR tried to steer for about 30 mins but were not able to 
       increase our ZDC rates.
    2. Run 4808 with 86.3 trigger 1 events. About 1/3 of these have 
       T3 & T5 anode 1 off as I did not detect the trip untill 15 mins.
       after it occured.
       Run 4809 still running.
    3. T3 & T5 anode 1 tripped once, about the same time. Voltages 
       remounted without problems.
       
    ------------------------------------------------------------
    