Shift report 20010918 08:00-16:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Tue Sep 18 2001 - 15:55:35 EDT

  • Next message: Apache: "Shift report 20010919 16:00-24:00"

    ------------------------------------------------------------
    Date: Tue Sep 18 15:55:34 2001, Shift: 08:00-16:00
    Supervisor: EJ, with: DS
    Log book#9 pages 1 - 4
    
    Shift Summary:
    ------------------------------------------------------------
    1. Beam from 9 to 11. RHIC access from 11 to 14.    
    2. Run 4789 (26K trig 1)
       Run 4790 (67K trig 1)
       Polarities changed for FS (B -> A) and field on D5 to 
       700 Amps.
    3. No new detector problems detected. Problems with H1 bot
       ch33 solved (hopefully). 
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Tue Sep 18 2001 - 15:56:24 EDT