Shift report 20010917 08:00-16:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Mon Sep 17 2001 - 16:13:06 EDT

  • Next message: Apache: "Shift report 20010918 16:00-24:00"

    ------------------------------------------------------------
    Date: Mon Sep 17 16:13:06 2001, Shift: 08:00-16:00
    Supervisor: Eun-Joo Kim, with: FV
    Log book#8 pages 143 - 146
    
    Shift Summary:
    ------------------------------------------------------------
    1. No beam ; RF study etc.
    
    2. Run 4769 : DVM run
                  Vd(TPM1) ~ 1.4306
                  Vd(TPM2) ~ 1.4276
                  Vd(T1)   ~ 1.4914
                  Vd(T2)   ~ 1.4472   
    
    3. No detector problems
    
    -- FV modified fb SFI code.
    -- FV remapped TOFW.
    -- FV added data record for TDC starts.
    
    -- EJK made DVM macro. It is under ~operator/dvm.
       It is a bit messy, not neat. 
       Some Info is in README file.
       
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Mon Sep 17 2001 - 16:13:37 EDT