Shift report 20010913 16:00-24:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Thu Sep 13 2001 - 00:37:20 EDT

  • Next message: Apache: "Shift report 20010913 00:00-08:00"

    ------------------------------------------------------------
    Date: Thu Sep 13 00:37:20 2001, Shift: 16:00-24:00
    Supervisor: JH Lee, with: 
    Log book#8 pages 1161 - 121
    
    Shift Summary:
    ------------------------------------------------------------
    1. Machine:
       - Beam is cogged since 21:30
       - ZDC rate: 100/sec and 
       - Event rate: 50/sec with triggers 1,3,4,8 
         at the beginning of the store
       - Vertex centered at ~ 0 with sigma ~ 45cm
     
    2. Data   
       - TDC Calibration runs: runs 4709 and 4710
         (run 4710 is for testing time dependence of TDC's)
       - Physics Data: Run 4711 (~200K trigger 1 events so far)
       - MRS at 90 (2B) and FS at 8 degree (A)
    
    3. Achivements
       - Fixed TOFW Mapping Error for Channels 51-55  (FV)
       - Changed Fiber HV settings for better signals (DB)
    
    4. Problems   
       - No new detector/HV problem except 
         a few minor/known ones
        (TOFW 56 Top, TOFW 18 Bottom, H1 33 Bottom, 
         few missing channels in DC's...) 
    
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Thu Sep 13 2001 - 00:37:59 EDT