------------------------------------------------------------
Date: Tue Sep 11 11:40:46 2001, Shift: 08:00-16:00
Supervisor: Eun-Joo Kim, with:
Log book#8 pages 112 - 113
Shift Summary:
------------------------------------------------------------
1. Beam from 8:44 to 9:21, about 40min.
2. Run 4696 : Data run 138k trigger 1
Run 4702 : Camac Pedestal Run
Run 4703 : TPC Pedestal Run
3. No detector problems.
During the data-taking for Run 4696, T3 tripped once.
The currents of T3-T5 as follows;
T3 : Anode 1 (110.72)
Anode 2 ( 88.96)
Anode 3 ( 96.52)
T4 : Anode 1 ( 26.57)
Anode 2 ( 19.47)
Anode 3 ( 17.00)
T5 : Anode 1 (118.14)
Anode 2 ( 56.10)
Anode 3 ( 63.30)
T3 Field(1-3) Actual values are fluctuated. (up and down)
RHIC message:C-A Department facilities will be shut down
for the next 24 hrs.
Magnet D1-D5 : standby state
------------------------------------------------------------
This archive was generated by hypermail 2b30 : Tue Sep 11 2001 - 11:41:21 EDT