Date: Mon Sep 10 16:07:49 2001, Shift: 08:00-16:00
Supervisor: Eun-Joo, with: FV, Dana
Log book#8 pages 105 - 106
Shift Summary:
------------------------------------------------------------
1. No useful beam. (beam study with 6-bunch beam)
2. Run 4665 : Camac Pedestal Run
Run 4688 : TPC Pedestal Run
Run 4689 : TDC Calibration Run for Dana
3. No detector Problems.
Dana fixed H1 TDC Bot33, Top15.
DAQ problem when I tried to TPC Pedestal Run
-> Problems : FB3-Comm error
Trigger 1 increased instead of Trigger 7
-> I followed Hiro's shift report in Sep-01.
-> I stop/start IOServer, RunServer in DAQ tasks
many times (more than 10).
-> Suddenly fixed, and I don't know why/how.
------------------------------------------------------------