Shift report 20010910 00:00-08:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Mon Sep 10 2001 - 08:05:45 EDT

  • Next message: Apache: "Shift report 20010910 08:00-16:00"

    ------------------------------------------------------------
    Date: Mon Sep 10 08:05:45 2001, Shift: 00:00-08:00
    Supervisor: Alexandru Jipa, with: -
    Log book#8 pages 103 - 105
    
    Shift Summary:
    ------------------------------------------------------------
    1. Beam up to 1.45. Beam between 4.05 and 7.00, again.
    2. Runs 4662 (23.57-1.44), 4663 (4.16-5.24), 4664 (5.27-7.03
    - works at RHIC RF during the run). Around 600 K in trigger 1.
    3. No detector problems 
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Mon Sep 10 2001 - 08:06:06 EDT