Date: Sat Sep  8 00:16:29 2001, Shift: 16:00-24:00
Supervisor: K. Hagel, with: 
Log book#8 pages 91 - 93
Shift Summary:
------------------------------------------------------------
5 minutes of beam during the entire shift
Then: Security from PASS division A lost.  RHIC zones
6z1 and 6z2 need to be reswept
At shift end, monitor reads that RHIC has been resecured;
Preparing from 56 bunch ramp.
Did a long DVM calibration run to try to get statistics
for TPM1 to verify drift velocity.  That was run 4635.
We can see if it was enough.  Plots with centroids notated
are pasted in logbook.
NOTE: During shift check, I noticed that Ar working is
      empty (reserve bottles are OK) and that the N2 working
      is nearly empty (reserve bottles also OK)  I don't
      think this is urgent, but could become so if not
      addressed.
------------------------------------------------------------