------------------------------------------------------------
Date: Thu Sep 6 07:50:37 2001, Shift: 00:00-08:00
Supervisor: EJ, with: DS
Log book#8 pages 83 - 84
Shift Summary:
------------------------------------------------------------
1. Beam all night.
2. Run 4611 with 124 K trigger 1 events
Run 4612 with 85 K trigger 1 events
Run 4613 with 35 K trigger 1 events
---
244 K
with the previous 0.76 M trig 1 events, there is now 1M
trigger 1 events with polarity B, and polarity was
therefore changed. Run 4614 has 11 K trigger 1 events.
3. No detector problems.
------------------------------------------------------------
This archive was generated by hypermail 2b30 : Thu Sep 06 2001 - 07:51:11 EDT