Shift report 20010906 16:00-24:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Thu Sep 06 2001 - 00:05:38 EDT

  • Next message: Apache: "Shift report 20010906 00:00-08:00"

    ------------------------------------------------------------
    Date: Thu Sep  6 00:05:38 2001, Shift: 16:00-24:00
    Supervisor: ZM, with: -
    Log book#8 pages 82 - 82
    
    Shift Summary:
    ------------------------------------------------------------
    1. Beam stored and cogged ta 20:10 and still stable.
    
    2. Run # 4609 (.28M event) Run # 4610 stil runing
    
    3. No detector problems.
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Thu Sep 06 2001 - 00:06:29 EDT