------------------------------------------------------------ Date: Sat Aug 18 16:17:44 2001, Shift: 08:00-16:00 Supervisor: JIJ, with: TL Log book#107 pages 121 - 123 Shift Summary: ------------------------------------------------------------ 1. A couple of quench link interlocks when we had rather good beam, at 10:36 and 13:33 MCR called and reported "cfe-2c-brahms response failure". Related to RHIC VME crate for magnet controls, i.e. RHIC's business. MCR rebooted the crate and things look fine. 2. Run 4268: 67.9k trigger 1 events Run 4271: 65.5k trigger 1 events (That sums up to ~800k trigger 1 events at B polarity setting started 8/16 i.e. ~200k to go.) 3. T3 anodes 2 are down. Probably broken wire One bad chip in FEE card on T1 row 4. Should be swapped at next access. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Sat Aug 18 2001 - 16:18:36 EDT