Shift report 20010804 08:00-16:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sat Aug 04 2001 - 16:23:11 EDT

  • Next message: Apache: "Shift report 20010805 16:00-24:00"

    ------------------------------------------------------------
    Date: Sat Aug  4 16:23:10 2001, Shift: 08:00-16:00
    Supervisor: CR, with: 
    Log book#7 pages 18 - 19
    
    Shift Summary:
    ------------------------------------------------------------
    1. No beam for the entire shift.
       All shift attemptions to improve the beam intensity in AGS
    2. No runs, no achivements.
    3. No problems with the detectors.
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Sat Aug 04 2001 - 16:24:25 EDT